home  |  resume |  architecture   1    2    3    4    5  |  building technology   1    2    3    4    5  |  contact
Since the steel industry got sour, a lot of inhabitants of Seraing are out of work and the future of the youngsters is not bright either. Therefor a building is needed which will get the different people together and give them a better perspective; an open air theatre.
The location of this building is the park near Rue Ferrer. The wall situated between the two patches of grass creates a seperation. By demolishing a part of the wall a connection is established and the green scenery can function as scenery for the
stage/artist. By creating a stage with a stand and facilitating rooms, all kinds of people can use  the stage. And by integrating sliding panels in the stage, the artist can decide to what extend he/she wants to show the green or the self-created scenery(panels).